Site Map | TR | EN | RU
Countries
Azerbaijan
Bulgaria
Iraq
Libya
Moldavia
Romania
Russia
Turkey
Ukraine
Client : Istanbul Water and Sewerage Administration (ISKI), Turkey
Project Scope : Construction of a wastewater system including a 2 m diameter 8.8 km long main tunnel constructed by a Tunnel Boring Machine (TBM), branch tunnels, tunnel shafts, wastewater channel constructed by pipe-jacking method, wastewater collector lines and testing chimneys
Construction Area :
Construction Date : 1999-2002
 
   
© Copyright 2016 - Hazinedaroglu Construction Group
Oya Çıkmazı, Eren Sok. No:8 Gayrettepe, 34394 Istanbul, Turkey
Produced by Netwise-Praksis