Site Map | TR | EN | RU
Countries
Azerbaijan
Bulgaria
Iraq
Libya
Moldavia
Romania
Russia
Turkey
Ukraine
Client : Petroleum Pipeline Corporation (BOTAS), Turkey
Project Scope : Turnkey construction of a 48’’ natural gas pipeline from Samsun at the Black Sea Coast of Turkey to the capital Ankara including 4 pigging stations, 6 take-offs and a reducing and metering station with a capacity of 16 billion m3 per year
Construction Area : 501 km
Construction Date : 1999-2002
 
   
© Copyright 2016 - Hazinedaroglu Construction Group
Oya Çıkmazı, Eren Sok. No:8 Gayrettepe, 34394 Istanbul, Turkey
Produced by Netwise-Praksis